Why can dual sourcing still leave two suppliers late on the same part?
Two machine shops may depend on one heat-treatment plant. Before splitting an order, ask when each quoted lead time starts and whether the outside queue is included.
Perspectives
Both parts passed inspection. Could tolerance stack-up explain the assembly misfit?
A windshield case explains tolerance stack-up. For a first production order, buyers can check which drawing was quoted and what dimensional inspection the price covers.
Perspectives
When every supplier quote is over target cost, should you change the drawing?
Before asking engineering to relax a tolerance, check which drawing revision and order quantity each supplier priced. A bracket example shows who needs to requote.
Perspectives
How much of a supplier’s price increase comes from raw materials?
A commodity index gives part of the answer. To review a finished-part price increase, check the material share and whether order quantity or drawing revision changed.