Guides
Step-by-step answers and checklists for the problems practitioners search for.
Guides
How do you explain price and lead-time gaps between an incumbent and a new supplier?
An approval meeting needs a defensible supplier comparison. See how to explain a price gap, identify the missing requote and separate quote terms from supplier qualification.
Guides
Four quote assumptions to revisit between prototype approval and the first pilot order
A successful prototype leaves four commercial questions open for the first pilot lot. Recheck the drawing, quantity, inspection and finishing scope, and lead-time start.
Guides
What if the lowest part price excludes inspection and finishing?
A low unit price can leave inspection or finishing on a separate invoice. Confirm what each supplier includes and whether additional fees apply per part or per batch.
Guides
How do you compare a 300-piece prototype quote with a 1,000-piece production quote?
A volume price can understate the cost of a prototype batch. Ask for the actual order quantity and check how setup, inspection and finishing are charged.
Guides
Should you issue a purchase order on an old quote after a drawing revision?
A buyer needs 300 parts to Rev C, but one quote still covers 1,000 to Rev B. See what to ask the supplier before releasing the purchase order.
Guides
Which supplier delivers first when one quotes three weeks and the other four?
Three weeks from material arrival and four weeks from PO receipt use different clocks. Compare the start event, finishing, inspection and arrival date.