Insights
Browse articles
Categories
Tags
11 articles
Guides
How do you explain price and lead-time gaps between an incumbent and a new supplier?
An approval meeting needs a defensible supplier comparison. See how to explain a price gap, identify the missing requote and separate quote terms from supplier qualification.
Guides
Four quote assumptions to revisit between prototype approval and the first pilot order
A successful prototype leaves four commercial questions open for the first pilot lot. Recheck the drawing, quantity, inspection and finishing scope, and lead-time start.
Guides
What if the lowest part price excludes inspection and finishing?
A low unit price can leave inspection or finishing on a separate invoice. Confirm what each supplier includes and whether additional fees apply per part or per batch.
Guides
How do you compare a 300-piece prototype quote with a 1,000-piece production quote?
A volume price can understate the cost of a prototype batch. Ask for the actual order quantity and check how setup, inspection and finishing are charged.
Guides
Should you issue a purchase order on an old quote after a drawing revision?
A buyer needs 300 parts to Rev C, but one quote still covers 1,000 to Rev B. See what to ask the supplier before releasing the purchase order.
Perspectives
Why can dual sourcing still leave two suppliers late on the same part?
Two machine shops may depend on one heat-treatment plant. Before splitting an order, ask when each quoted lead time starts and whether the outside queue is included.
Perspectives
Both parts passed inspection. Could tolerance stack-up explain the assembly misfit?
A windshield case explains tolerance stack-up. For a first production order, buyers can check which drawing was quoted and what dimensional inspection the price covers.
Guides
Which supplier delivers first when one quotes three weeks and the other four?
Three weeks from material arrival and four weeks from PO receipt use different clocks. Compare the start event, finishing, inspection and arrival date.
Perspectives
When every supplier quote is over target cost, should you change the drawing?
Before asking engineering to relax a tolerance, check which drawing revision and order quantity each supplier priced. A bracket example shows who needs to requote.
Perspectives
How much of a supplier’s price increase comes from raw materials?
A commodity index gives part of the answer. To review a finished-part price increase, check the material share and whether order quantity or drawing revision changed.
Kairen News
Kairen brand film: Imagine a Greater Future
Kairen's 45-second brand film, Imagine a Greater Future — Agentic Sourcing, is on Kairen's YouTube channel in English and Korean.
No article matches these choices.