How do you compare a 300-piece prototype quote with a 1,000-piece production quote?

A volume price can understate the cost of a prototype batch. Ask for the actual order quantity and check how setup, inspection and finishing are charged.

Kairen2 min read

One shop returns the requested price for a 300-piece pilot. Another sends its 1,000-piece production tier. If the lower number goes straight into the budget, the buyer still cannot say whether the shop will make the first 300 at that price.

Which price belongs in the pilot budget?

In Kairen Covenant’s fictional bracket example, the buyer needs 300 pieces to Rev C. Supplier A quoted KRW 18,000 per part and three weeks for 1,000 pieces to Rev B. Supplier B quoted KRW 21,000 per part and four weeks for 300 pieces to Rev C.

Ask Supplier A for a firm price at 300 and a separate indication at 1,000, both to Rev C. Request the applicable setup fee, any minimum inspection or finishing charge, and the event that starts the lead time. The 300-piece offer can then support the budget. Keep the volume tier for a future order.

See the two quantity tiers in the Kairen Covenant quote example

Ask what changes at the next volume tier

When order volume scales from a 300-piece pilot batch to 1,000 or more production units, what percentage unit-price reduction should setup amortization and material purchasing economies logically yield?

Ask the shop to separate one-time setup from variable cost on quotes for both quantities to the same revision. That gives the buyer a basis for evaluating the discount.

FAR 15.404-1(b)(2)(ii)(B) describes adjusting a historical price for material differences in terms or quantities. It illustrates why a quantity tier matters to a comparison.1

Notes

  1. Acquisition.gov · FAR 15.404-1 — Proposal analysis techniques ↩

References

  1. FAR 15.404-1 — Proposal analysis techniques. Acquisition.gov.

Cite this article

Kairen. “How do you compare a 300-piece prototype quote with a 1,000-piece production quote?.” Kairen Insights, November 21, 2026. https://kairenhq.com/insights/prototype-vs-production-quote-quantities